Two important phases remain to complete the restoration of the Hatch Mill and once again return it to operations. The Hatch Mill Group is seeking partners to join in seeing this unique structure once again restored to its original purpose.

Phase One

Dredging of Hatch Mill Pond

The Hatch Mill pond has filled in with approximately two feet of silt from upstream. Dredging will allow the pond to retain enough water to power the saw by turning the water wheel.

Phase Two

Replacement of the Original Up and Down Saw Mill Machinery

The stone weir sluiceway water control device has been rebuilt, but the 1812 saw must be replaced.